| Below is a video of a Case WX170 Megarailer undergoing calibration at AJH Plant as part of the last stages of EAC validation. |
We can provide a cost effective solution for Road rail excavators and equipment up-grades to meet RIS-1530-PLT issue 3 (Download RIS-1530-PLT issue 3).
We have the facilities to carry out upgrades comprising of the following:
- Replace RCI system and calibration.
- Install hydraulic motion control.
- System supply and install for dual air brake systems.
- Bogie interlocking.
- Rail lights - auto direction change.
- Brake testing.
- Decal and sign-writing.
- VAB approval certification and engineering acceptance.
|