ADIF launches Madrid-Valladolid CTC maintenance tender

ADIF has issued a €29.3 million tender for the maintenance of traffic control infrastructure and associated systems on the Madrid-Valladolid high-speed line.

The contract, which also covers the Olmedo-Medina del Campo branch line, has a predicted delivery time of 48 months.

As well as detecting and fixing faults, the key aim of the works is to carry out preventative maintenance to reduce the chance of failures.

ADIF said the contract is “intended to maintain and optimize the commercial conditions of the line”.